by tlandrum » Mon Oct 13, 2014 11:16 pm
I have all of ribs 2-5, 9, and 10 complete, but I have a few questions on 6-8
Rib 6 I have down... just don't put the gussets on the back, just use the 3/32" dubbers, on both sides.
Rib 7 and 8 are the ones that really confuse me. Looking at the plans it talked about the wider spar holes for the doublers... no problem, I made some jigs, and made a couple of ribs with them... but I went back to look at the plans again... and it looks like the "Rib 7" with the larger spar holes, and with the pattern in the plans... is actually only rib 7 on the bottom ribs... it is Rib 8 on the top ribs?!?!
So is the Rib 7 only correctly named on the bottom wing... but on the top wing you should switch the rib 7 and 8? I hope that makes sense. Am I correct on this?
Tre'
I have all of ribs 2-5, 9, and 10 complete, but I have a few questions on 6-8
Rib 6 I have down... just don't put the gussets on the back, just use the 3/32" dubbers, on both sides.
Rib 7 and 8 are the ones that really confuse me. Looking at the plans it talked about the wider spar holes for the doublers... no problem, I made some jigs, and made a couple of ribs with them... but I went back to look at the plans again... and it looks like the "Rib 7" with the larger spar holes, and with the pattern in the plans... is actually only rib 7 on the bottom ribs... it is Rib 8 on the top ribs?!?!
So is the Rib 7 only correctly named on the bottom wing... but on the top wing you should switch the rib 7 and 8? I hope that makes sense. Am I correct on this?
Tre'